Module 6B

MODUŁ 6B

  • to be founded at the depth of -280 cm
  • 12 steps to go down
  • 100% watertight
  • monolithic, robust construction
  • full cellar foundation below ground level
  • external door to be made "flat"
  • in this variant it is possible to completely hide the cellar and mask the entrance
  • foundation of the cellar under the building, driveway for cars, terrace, gazebo
  • electrical installation with accessories
  • ventilation system with accessories
  • interior design options and door deliveries
  • individual customisation